Berlin, Nov. 26 – German Airbus workers at the Manching plant have firmly rejected joining the Global Combat Air Program, urging Berlin instead to launch an immediate national sixth-generation fighter jet project. Following the mid-2026 collapse of the Franco-German-Spanish Future Combat Air System, the Manching works council warned that entering the United Kingdom, Italy, and Japan defense alliance would leave German aerospace engineering with diminished industrial control and set operational requirements.
Works council chairman Thomas Pretzl argued that joining an established multinational program risks repeating past political friction while restricting domestic technological ownership. Employees propose a rapid German development contract that remains open to future partners, targeting a prototype maiden flight by 2032 to field the aircraft before 2040.
“We should not repeat the political mistakes made during the fighter jet development with France.”
— Thomas Pretzl, Chairman of the Airbus Manching Works Council
Eurofighter Typhoon production at Manching currently secures workload only until roughly 2034 across 58 remaining aircraft orders. Workers warn that prolonged government hesitation could force additional United States F-35 fighter purchases, eroding sovereign defense manufacturing skills.
Defense Minister Boris Pistorius indicated a strategic decision is expected in early 2027 as Germany weighs sovereign fighter development, European partnerships, and Global Combat Air Program participation.

